Yes — if you're renovating or have just received keys to a new house, it's worth getting a termite inspection and, where advised, a soil treatment before built-in furniture and new flooring are installed. It's easier and usually cheaper than treating after termites have reached your new cabinets.
Why before, not after
Once kitchen cabinets, wardrobes and flooring are installed, a lot of the areas termites travel through are hidden. Treatment then means drilling through new tiles or working around finished carpentry. Before renovation, floors and walls are open and accessible.
Who should consider it
- New houses in estates built on former plantation or agricultural land, common on the mainland
- Older homes where timber has been replaced or added
- Anyone adding built-in carpentry, wooden flooring or a timber deck
- Homes with a history of termites on the same street
What to ask your renovation contractor
- Is there any timber in contact with the ground or walls?
- Will new carpentry sit on the floor or be raised?
- Can termite treatment be scheduled before tiling and carpentry?
- Are there plumbing or wall penetrations that need sealing?
The order of work
Inspection → treatment (if needed) → tiling and flooring → carpentry and built-ins → final checks. Keep the treatment report and warranty with your house documents.
Frequently asked questions
Does a new house really get termites?
It can. Many estates are built on land where termite colonies already live in the soil, and termites often find new timber fittings within a few years.
Can treatment be done after renovation?
Yes, but it is usually more disruptive. Baiting can handle active infestations with little drilling.